Projects
Makro network migrations
2009–2012
Between 2009 and 2010 I migrated the networks of all Makro cash-and-carry stores and logistics platforms. I made bulk changes to trunk ports across the entire network using my own scripts.
In 2011–2012 I prepared a switch replacement with PoE-capable models: I wrote a configuration generator and used a terminal server to pre-configure new switches in bulk for branch offices, logistics platforms and drive-in collection points.