← Back to projects

Projects

Inspirotec Call Centre Network

  • Cisco ASA failover pair with AnyConnect VPN and multi-factor authentication via RADIUS,
  • migration of the call centre network to a dedicated VRF in the MPLS network (2019), interconnections to partner networks,
  • connectivity migration to SD-WAN (2025), new remote-access VPN and switches.